|
Sinisa Saric Staff Engineer I Krieger & Stewart, Incorporated |
|
Representative Assignments: Construction observation of waterline construction consisting of traffic control, excavation, trench protection, backfilling, compacting, connections, pavement replacement, and pipe testing and disinfection. Field excavation and verification of existing utilities. Observation of well construction including drilling, well development, testing, and disinfection. Topographic and control surveying for water system facilities. Assist engineers in various design engineering tasks in the office including HEC-1 and civil design computer programs. As-built drawings and design of various pipeline details and changes in design for water supply system for the City of Algiers, Algeria. Various design tasks for waterlines in Bosnia. Affiliations: © 2005 Krieger & Stewart, Incorporated |