Palm Canyon Drive (Highway 111) Improvement Project
|
|
Client:
City of Palm Springs and Desert Water Agency
Tom Cartwright, Engineering Supervisor
(760) 328-8253 x8733 | Construction Cost Information:
Original Contract: $2,591,200
Contract Change Orders: <$64,0000>
Change Order Percentage: <2.5%>
Final Construction Cost: $2,527,200 |
|
The project is one of the primary elements of the revitalization of downtown Palm Springs and includes many decorative streetscaping elements
that are consistent with the City's desert resort heritage. For instance, the design included specialized planter boxes, benches, light
standards, traffic signals, and trash receptacles, along with a number of small park settings. The project consisted of the construction of
approximately 50,000 L.F. of pavement (both asphalt concrete and decorative pavers) and 280,000 S.F. of slurry seal, along with 10,000± L.F.
of 16" and 12" diameter water pipeline. The project also included the replacement of existing concrete curbs and gutters, and the installation of
flood control facilities (e.g. catch basins and connector pipes).
| | |
Krieger & Stewart
Provided the following services:
PRELIMINARY SERVICES
Environmental Assessment/
CEQA Compliance
Alignment Selection
Resistance (R-value) Analyses
DESIGN ENGINEERING
Surveying
Facility and Site Design
Striping Plan Design
Contract Document Preparation
Bidding Phase Support
CONSTRUCTION ENGINEERING
Contract Administration
Compaction Testing
Submittals Review
Construction Surveying and
Observation
Acceptance (Final) Inspection
|