Well Pumping Plants 30 and 31
|
|
Client:
Indian Wells Valley Water District
LeRoy O. Tucker, Assistant General Manager
(760) 375-5089 | Construction Cost Information:
Original Contract: $664,900
Contract Change Orders: $7,500
Change Order Percentage: 1.1%
Final Construction Cost: $672,400 |
|
The project consisted of the construction of two wells and two well pumping plants. Each of the wells is approximately 1,200 feet deep and
has a 16" diameter casing. The well pumping plants, which produce about 1,200 GPM and are equipped with a 200 HP pumping unit. As shown in the
photographs, the pumping plants are housed in two-piece steel structures which roll open to allow ready access to the pumping units for maintenance,
including removal of the entire pumping unit (motor, column, shaft, and pump bowls).
| | |
Krieger & Stewart
Provided the following services:
PRELIMINARY SERVICES
Site Selection/Acquisition
Environmental Assessment/
CEQA Compliance
Project Financing
Equipment Selection
DESIGN ENGINEERING
Surveying
Facility and Site Design
Well Design (i.e. Gravel Pack and Well Screen)
Structural, Mechanical,
and Electrical Engineering
Contract Document Preparation
Bidding Phase Support
CONSTRUCTION ENGINEERING
Contract Administration
Submittals Review
Construction Surveying and Observation
Formation Sampling
Acceptance (Final) Inspection
|