Reservoir & Booster Pumping Plant
|
|
Client:
Indian Wells Valley Water District
LeRoy O. Tucker, Assistant General Manager
(760) 375-5089 | Construction Cost Information:
Original Contract: $1,107,000
Contract Change Orders: $0
Change Order Percentage: 0%
Final Construction Cost: $1,107,000 |
|
The Project consisted of the construction of a 3.0 MG welded steel water storage reservoir, a 1600 GPM booster pumping plant
(three pumping units, one 40 HP and two 20 HP), site piping, and appurtenant facilities. The facilities were constructed
on a three acre parcel, and are located partially below grade to limit aesthetic impacts. The pumping units are housed in a
split steel structure, which rolls apart to simplify access for operating and maintaining the pumping plant.
| | |
Krieger & Stewart
Provided the following services:
PRELIMINARY SERVICES
Preliminary Design Report
Project Financing
Environmental Assessment/
CEQA Compliance
Equipment Selection
DESIGN ENGINEERING
Surveying
Facility and Site Design
Structural, Mechanical, and
Electrical Engineering
Contract Document Preparation
Bidding Phase Support
CONSTRUCTION ENGINEERING
Contract Administration
Submittals Review
Construction Surveying and
Observation
Acceptance (Final) Inspection
|